VIREON POWER
Six-Month Rental

Prove it on your own meter before you buy.

Rent a Reinigen unit for six months. Your electrician installs it, we measure before and after, and you decide on the results.

The price

$15,000

for the six-month term

Works out to about $2,500 a month: an operating expense many managers can approve themselves, rather than a capital request.

Does it cover itself on your numbers? Rental Math

Final terms are confirmed in writing before installation.

What’s included

  • A Reinigen unit (60–120 kVAR, 480 V three-phase) for six months
  • Metering of your panel before installation and again after
  • A written before-and-after performance report, walked through with your team

What you provide

  • A 480 V three-phase panel or switchboard to correct
  • Wall, rack or cabinet space for a 24 × 30 × 10 in unit (133 lb)
  • Your own licensed electrician to install it
  • Access for our meters before and during the term
The Six Months

How the rental runs.

1

Baseline

Before anything is installed, we meter the panel to record its power factor, reactive power, current and harmonics under normal operation.

2

Installation

Your licensed electrician installs the unit on the panel. It mounts on a wall, a rack or in a cabinet.

3

Six months of operation

The unit corrects continuously. Its touchscreen shows grid-side and load-side current and power factor in real time, and it reports over Modbus if you want the data in your building-management system.

4

Measurement and report

We measure again under comparable conditions and put before and after side by side in a written report.

5

Your decision

Buy the unit, lease it, keep renting, add units on other panels, or return it.

Month Six

Five ways to finish the term.

Purchase

When you are ready to own the unit and keep the long-term savings.

Lease

Predictable payments that preserve capital.

Keep renting

More time on the meter, for example to see another season.

Expand

Apply the result to more panels, buildings or production lines.

Return

The unit comes out. You keep the data and the report.

A fair comparison

Cooling load, production schedules and occupancy change through the year. We compare power factor, reactive power and current under comparable conditions and flag anything that changed, so the result holds up in front of your finance team.

Planning a facility-wide system?

MPTS starts differently: a monitoring meter goes in at your service first, for $5,000 credited toward the system, and the load data sizes the units.

About MPTS