VIREON POWER
Results

Reported results, with the meter data behind them.

One case measured on a Reinigen installation, and four installations reported by the developer of MPTS. Each shows how it was measured and whose installation it was.

Reinigen · Measured

Distribution facility, main switchboard

A power recorder on the main switchboard, before the unit went in (12–17 June 2024, about five days) and after (21–28 April 2026, seven days). The charts are traced from the recorder’s own printouts.

MeasureBeforeAfter
Average power factor0.8701.000
Lowest power factor0.7880.998*
Average reactive power101 kVAR3.0 kVAR
Apparent power above real load16%0%

* The recorder’s first April reading, logged as it started, was 0.950 PF and 54.8 kVAR. Every later reading stayed between 0.998 and 1.000 power factor and under about 10 kVAR.

Apparent power above real load: average kVA over average kW. Before, 203 kVA carried 175 kW of real load; after, 116.1 kVA carried 116.1 kW.

Put your own switchboard’s numbers in the Power Factor Check

Play the weeks back

The before and after weeks lined up by weekday and clock time. Press Play, or drag across the chart, and read both dials.

Thursday · 2:30 pmWed noon → Mon 10 am
BeforeThu 13 Jun 2024
0.90

0.836

power factor

120 kVA carried for every 100 kW of work

Below 0.90

Below 0.90 for 24.5 of 27 hours so far

AfterThu 23 Apr 2026
0.90

0.999

power factor

100 kVA carried for every 100 kW of work

0.90 or better

Below 0.90 for 0 of 27 hours so far

  • Before · 12–17 June 2024
  • After · 22–27 April 2026
  • 0.90, a common US utility threshold (others use 0.85 or 0.95)

Drag across the chart to scrub. Half-hour averages traced from the power recorder’s own charts; the two weeks line up by weekday and clock time. They ran different loads, June and April, so the replay compares power factor only, never kW or dollars. The April recording’s first reading (0.950, logged as the recorder started on the Tuesday) falls before the window shown.

Thursday 2:30 pm. Before 0.836, below 0.90. After 0.999.

Power factor

Half-hour averages as a line; the shaded band spans the lowest and highest readings in each half hour.

Before12–17 June 2024
Average 0.870

After21–28 April 2026
Average 1.000

Show the numbers
Power factor: the power recorder's printed summary for each week
WeekAverageMinimumMaximum
Before (12–17 June 2024)0.8700.7880.986
After (21–28 April 2026)1.0000.9501.000

The April recording’s first reading, logged as the recorder started, was 0.950 PF and 54.8 kVAR. Every later reading stayed between 0.998 and 1.000 PF and under about 10 kVAR.

Reactive power (kVAR)

Before, reactive power stepped between roughly 40 and 180 kVAR with the working day. After, it stayed within a few kVAR of zero around the clock.

Before12–17 June 2024
Average 101 kVAR

After21–28 April 2026
Average 3.0 kVAR

Show the numbers
Reactive power: the power recorder's printed summary for each week
WeekAverageMinimumMaximum
Before (12–17 June 2024)101 kVAR23 kVAR202 kVAR
After (21–28 April 2026)3.0 kVAR−3.6 kVAR54.8 kVAR

The April recording’s first reading, logged as the recorder started, was 0.950 PF and 54.8 kVAR. Every later reading stayed between 0.998 and 1.000 PF and under about 10 kVAR.

Read this before comparing kW

The two recordings come from different seasons: a June week with cooling load and an April week without it. Real power averaged 175 kW before and 116 kW after, a 34% difference that power-factor correction cannot produce by itself. So we report power factor, reactive power and the ratio of apparent to real power, which reflect what the unit does, and not the kW or kVA totals, which mostly reflect the season. A same-season or on/off comparison would settle the rest.

Real power (kW): changed with the season, not the unit

Power-factor correction cannot cut real power by a third on its own. The June week carried summer cooling load, and its overnight load alone ran nearly twice April’s. That is why we don’t count the kW or kVA difference as savings.

Before12–17 June 2024
Average 175 kW

After21–28 April 2026
Average 116.1 kW

Show the numbers
Real power: the power recorder's printed summary for each week
WeekAverageMinimumMaximum
Before (12–17 June 2024)175 kW62 kW304 kW
After (21–28 April 2026)116.1 kW47.4 kW197.4 kW
Reported by the Manufacturer

MPTS installations, as reported by Trans Power Company.

These installations belong to Trans Power Company, the developer of MPTS, and come from its case-study material. We did not measure them, and results at another site will differ.

MPTS · Reported by Trans Power

Citrus packing plant, California

Utility bills and 15-minute interval data, 2016–2019, plus panel instrumentation.

  • Average seasonal demand 562 → 425 kW while production rose about 25%
  • Power factor 0.77 → 0.99
  • Reactive power 247 → 57 kVAR
  • Average current down 21%; peak current down 17%
MPTS · Reported by Trans Power

Office building, 142,300 sq ft

Three MPTS units on a 3,000 kVA transformer; two-week electrical fingerprint.

  • Apparent power 390 → 321 kVA (−17.8%)
  • Reactive power 216 → 6.9 kVAR (−96.8%)
  • Power factor 0.85 → 0.99
MPTS · Reported by Trans Power

Plastic injection molding plant

Instrumentation and utility billing data, continuous production.

  • Average demand 636 → 465 kVA
  • Real power demand 563 → 444 kW
  • Power factor 0.73 → 0.98
MPTS · Reported by Trans Power

Mission-critical military installation

An early installation on a 1,200 kVA transformer; monitoring data from the facility’s engineers.

  • Power factor 0.298 → 0.811
  • Peak demand down about 73 kW
  • Reactive power down about 83 kVAR